City Project SC2509/SW2510 renovated the existing single story, 19,349 sq. ft. Wastewater/Stormwater Division Collections Facility. The City contracted with POW Contracting, Inc. for the renovation.
Final inspection for this project was made and the recommendation is that the project be accepted.
Project Manager: Dana Kallevig
Contractor: POW Contracting
Contract Award: 3/17/2020
Contract Cost: $745,062.74
Total Due: $0.00
The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project. |