Item No. 4.H.
For Meeting of: November 17, 2020

ITEM TITLE:Resolution authorizing an agreement with POW Contracting, Inc. for City Project No. 2511 Beech Street Lift Station Odor Control Improvements
SUBMITTED BY:

Scott Schafer, Director of Public Works

David Brown, Assistant Director of Public Works

Mike Price, Wastewater/Stormwater Division Manager, 249-6815

SUMMARY EXPLANATION:

City of Yakima (City) Project No. 2511 Beech Street Lift Station Odor Control Improvements installs wet well ventilation improvements and an activated carbon air scrubber at the Beech Street Lift Station.  Staff have detected intermittent odor issues at the lift station and early signs of equipment corrosion associated with a lack of wet well ventilation. The ventilation improvements increase air exchange in the wet well to reduce equipment corrosion and the air scrubbing system treats the exchanged air to reduce lift station odor.

 

The City previously entered into an agreement with RH2 Engineering, Inc.  under City Contract No. 2020-036 to provide engineering design, bidding, and construction services for the UV Slide Gate Replacement.  The City utilized the procedure established by the State of Washington for competitively bidding projects.  POW Contracting, Inc. submitted the low bid of $208,802.  The contract is attached for City Council Review.  The project is funded by Wastewater Capital Fund 476.

ITEM BUDGETED:Yes
STRATEGIC PRIORITY:Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution