Item Coversheet

BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT

Item No. 4.G.
For Meeting of: December 1, 2020

ITEM TITLE:Resolution authorizing a contract with TML Construction, Inc. for Project No. 2525 UV Slide Gate Replacement
SUBMITTED BY:

Scott Schafer, Director of Public Works

David Brown, Assistant Director of Public Works

Mike Price, Wastewater/Stormwater Division Manager, 249-6815

SUMMARY EXPLANATION:

City of Yakima (City) Project No. 2525 UV Slide Gate Replacement replaces the six aluminum gates and six automatic gate motor operators that control wastewater treatment plant flow through the plant's ultraviolet (UV) effluent disinfection system.  Corrosion of the existing aluminum gates, installed in 2009, is interfering with automatic UV system operation and has caused excessive wear on the motor operators that function to raise and lower the gates. The replacement of the existing aluminum gates with corrosion-resistant stainless steel gates and the replacement of the worn motor operators will restore reliable automatic UV disinfection system operation.

 

The City previously entered into an agreement with Gray & Osborne, Inc.  under City Contract No. 2020-091 to provide engineering design, bidding, and construction services for the UV Slide Gate Replacement.  The City utilized the procedure established by the State of Washington for competitively bidding projects.  Nine contractors submitted bids, with TML Construction, Inc. submitting the lowest bid of $153,894.  The contract is attached for City Council review.  The project is funded by Wastewater Capital Fund 472.

ITEM BUDGETED:Yes
STRATEGIC PRIORITY:Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
DescriptionUpload DateType
Resolution11/17/2020Resolution
Contract11/20/2020Contract