This City Project 2463 & 2486 is located on Hathaway Street from North 6th Avenue to North 16th Avenue. The project installed approximately 3,200 LF 12-inch, 8-inch and 6-inch ductile iron water mains, valves, fire hydrants and new water services; 80 LF 30-inch culvert pipe to replace an existing canal crossing; approximately 2,080 LF 8-inch sewer main, 1,040 LF 4-inch sewer pipe, manholes, and reconnection of existing services to new the sewer; and lastly, reconstruction of the roadway.
Final inspection for this project was made and the recommendation is that the project be accepted. This Council action is to accept the project.
Project Manager: Mike Shane
Contractor: POW Contracting, Inc.
Contract Award: 12/7/18
Contract Cost: $1,163,033.35
Total Due: $0.00
The above total contract cost is for construction only and does not include engineering and other costs. |